Newbuilds
Orders and deliveries, one row per vessel.
- Vessels
- 81
Each row links to its source. A dash means not yet reported. Last checked .
| JANOT (opens in a new tab) | SPM Ferries (Saint-Pierre & Miquelon) | AISTER | Spain | ro-pax (small) | — | — | — | not stated | — | 2027 | keel laid | Chartwell Marine design; Saint-Pierre–Langlade | Workboat365 (opens in a new tab) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HADSEL (opens in a new tab) | Torghatten | — | — | ro-pax | — | — | — | electrified route (details not stated) | — | 2027 (service) | ordered | yard not stated in source | Ferry Shipping News (opens in a new tab) |
| TBN (Seongsan–Udo electric #1) (opens in a new tab) | Jeju Glass Bottom Boat | not stated (HD KSOE propulsion, turnkey) | South Korea | ro-pax | 60 | 400 | — | battery-electric (4.4 MWh) | 2026-09 | 2027 (service) | ordered | 20 vehicles | Korea Herald (Herald Biz) (opens in a new tab) |
| TBN (Seongsan–Udo electric #2) (opens in a new tab) | Jeju Glass Bottom Boat | not stated (HD KSOE propulsion, turnkey) | South Korea | ro-pax | 60 | 400 | — | battery-electric (4.4 MWh) | 2026-09 | 2027 (service) | ordered | 20 vehicles | Korea Herald (Herald Biz) (opens in a new tab) |
| TBN (Next Generation Med #1) (opens in a new tab) | Grimaldi Lines | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | batteries: https://ferryshippingnews.com/ayk-energys-orionan-batteries-selected-for-grimaldis-next-ropax-ships/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TBN (Next Generation Med #2) (opens in a new tab) | Grimaldi Lines | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | batteries: https://ferryshippingnews.com/ayk-energys-orionan-batteries-selected-for-grimaldis-next-ropax-ships/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TBN (Next Generation Med #3) (opens in a new tab) | Grimaldi Lines | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | batteries: https://ferryshippingnews.com/ayk-energys-orionan-batteries-selected-for-grimaldis-next-ropax-ships/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TBN (Next Generation Med #4) (opens in a new tab) | Grimaldi Lines | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | batteries: https://ferryshippingnews.com/ayk-energys-orionan-batteries-selected-for-grimaldis-next-ropax-ships/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TBN (Next Generation Med, Minoan #1) (opens in a new tab) | Minoan Lines (Grimaldi) | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | Piraeus–Heraklion among routes named | Ferry Shipping News (opens in a new tab) |
| TBN (Next Generation Med, Minoan #2) (opens in a new tab) | Minoan Lines (Grimaldi) | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 229 | 2500 | 3300 | methanol-ready; batteries (AYK 2,073 kWh); shore power ready | 2025-04-08 | 2028–2030 | ordered | Piraeus–Heraklion among routes named | Ferry Shipping News (opens in a new tab) |
| TBN (Hansa Superstar #1) (opens in a new tab) | Finnlines (Grimaldi) | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 240 | 1100 | 5100 | methanol-ready; batteries (AYK) | 2025-04-08 | 2028–2030 | ordered | Finland–Germany | Ferry Shipping News (opens in a new tab) |
| TBN (Hansa Superstar #2) (opens in a new tab) | Finnlines (Grimaldi) | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 240 | 1100 | 5100 | methanol-ready; batteries (AYK) | 2025-04-08 | 2028–2030 | ordered | Finland–Germany | Ferry Shipping News (opens in a new tab) |
| TBN (Hansa Superstar #3) (opens in a new tab) | Finnlines (Grimaldi) | China Merchants Jinling Shipyard (Weihai) | China | ro-pax | 240 | 1100 | 5100 | methanol-ready; batteries (AYK) | 2025-04-08 | 2028–2030 | ordered | Finland–Germany | Ferry Shipping News (opens in a new tab) |
| KUPE (opens in a new tab) | KiwiRail Interislander (owner Ferry Holdings Ltd) | Guangzhou Shipyard International | China | ro-pax (rail-enabled) | 200 | 1530 | 2400 | hybrid-electric, fuel-agnostic; 8.2 MWh battery (expandable 12.3) | 2025-12 | 2029 | ordered | Detailed design unveiled 26 November 2026 (RNZ / Ferry Holdings). | RNZ (opens in a new tab) |
| COOK (opens in a new tab) | KiwiRail Interislander (owner Ferry Holdings Ltd) | Guangzhou Shipyard International | China | ro-pax (rail-enabled) | 200 | 1530 | 2400 | hybrid-electric, fuel-agnostic; 8.2 MWh battery (expandable 12.3) | 2025-12 | 2029 | ordered | Detailed design unveiled 26 November 2026 (RNZ / Ferry Holdings). | RNZ (opens in a new tab) |
| TBN (E-Flexer 2.0 #1) (opens in a new tab) | Stena Line (owner Stena RoRo) | China Merchants Industry Weihai | China | ro-pax | 214.5 | 1500 | 2750 | hybrid (conventional fuel + battery; prepared for 100% electric) | 2026-09 | 2030 | ordered | Gothenburg–Frederikshavn; plus 2 options | Ferry Shipping News (opens in a new tab) |
| TBN (E-Flexer 2.0 #2) (opens in a new tab) | Stena Line (owner Stena RoRo) | China Merchants Industry Weihai | China | ro-pax | 214.5 | 1500 | 2750 | hybrid (conventional fuel + battery; prepared for 100% electric) | 2026-09 | 2030 | ordered | Gothenburg–Frederikshavn; plus 2 options | Ferry Shipping News (opens in a new tab) |
| INIS OIRR EXPRESS (opens in a new tab) | Vedettes Jolie France | Nova Shipyard | Türkiye | passenger ferry | 31 | 295 | — | diesel (IMO Tier III, exhaust gas cleaning) | — | after sea trials | launched | launched 12 Oct 2026 | News at Sea (opens in a new tab) |
| TBN (26m Île d'Yeu) (opens in a new tab) | Compagnie Vendéenne | Chantier Naval Delavergne | France | passenger ferry | 26 | — | — | not stated | 2025-12 | April 2027 | ordered | — | Ferry Shipping News (opens in a new tab) |
| TBN (Sealord 41) (opens in a new tab) | Dodekanisos Seaways | GOT Marine (Mandal) | Norway | fast ferry (catamaran) | 41 | 300+ | — | not stated | 2026-08 | autumn 2027 | ordered | 6 cars | Ferry Shipping News (opens in a new tab) |
| Incat 78m hybrid (spec build) (opens in a new tab) | none yet – for charter | Incat Tasmania | Australia | fast ferry (ro-pax catamaran) | 78 | 650 | — | hybrid (full-electric / hybrid / generator modes) | — | available Jan 2027 | under construction | 120 cars | Echandia (opens in a new tab) |
| TBN (Green Ship 2.0 #1) (opens in a new tab) | TT-Line (Germany) | China Merchants Jinling Shipyard (Nanjing) | China | ro-pax | 240 | 930 | 5400 | LNG-hybrid + 5.5–10 MWh battery; shore charging | 2025-12/2026-01 | before summer 2030 | ordered | Length 240 m is from MacGregor, 4 September 2026; the cited order article does not state length. MacGregor says 1,000 people; this article says 930 | Ferry Shipping News (opens in a new tab) |
| GNV JUPITER (yard no. 25110006) (opens in a new tab) | GNV (MSC Group) | Guangzhou Shipyard International | China | ro-pax | 237 | 2500 | 3500 | LNG dual-fuel | 2025 | by 2029 | ordered | FSN reported steel cutting for first unit of this batch Jan 2026 (unit not named) | Shippax (opens in a new tab) |
| GNV MARS (yard no. 25110007) (opens in a new tab) | GNV (MSC Group) | Guangzhou Shipyard International | China | ro-pax | 237 | 2500 | 3500 | LNG dual-fuel | 2025 | by 2029 | ordered | FSN reported steel cutting for first unit of this batch Jan 2026 (unit not named) | Shippax (opens in a new tab) |
| GNV MERCURY (yard no. 25110008) (opens in a new tab) | GNV (MSC Group) | Guangzhou Shipyard International | China | ro-pax | 237 | 2500 | 3500 | LNG dual-fuel | 2025 | by 2029 | ordered | FSN reported steel cutting for first unit of this batch Jan 2026 (unit not named) | Shippax (opens in a new tab) |
| GNV VENUS (yard no. 25110009) (opens in a new tab) | GNV (MSC Group) | Guangzhou Shipyard International | China | ro-pax | 237 | 2500 | 3500 | LNG dual-fuel | 2025 | by 2029 | ordered | FSN reported steel cutting for first unit of this batch Jan 2026 (unit not named) | Shippax (opens in a new tab) |
| ISLAND K'ASA (opens in a new tab) | BC Ferries | Damen Shipyards Galați | Romania | ro-pax (double-ended, Island Class) | — | — | — | hybrid-electric (designed for full electric) | — | early 2027 (service) | launched | Campbell River–Quadra Island | Ferry Shipping News (opens in a new tab) |
| LOCH AWE (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | end 2027 | under construction | — | Baird Maritime (opens in a new tab) |
| TBN (Virtsu–Kuivastu electric) (opens in a new tab) | Estonian State Fleet | CRIST S.A. | Poland | ro-pax | ~100 | 380 | — | battery-electric (3 MWh) + biodiesel backup | 2026-05 | end 2028 | ordered | EUR 49.93m; 110 cars | Ferry Shipping News (opens in a new tab) |
| TBN (Tarifa–Tangier electric #2) (opens in a new tab) | Baleària | Armón Gijón | Spain | fast ferry (catamaran) | — | — | — | battery-electric | — | end of 2027 | under construction | Second catamaran, under construction in the same dock as ESPAÑA 2030. Shippax says entry into service is expected at the end of 2027. | Shippax (opens in a new tab) |
| GLEN ROSA (opens in a new tab) | CalMac (owner CMAL) | Ferguson Marine | UK | ro-pax | — | — | — | LNG dual-fuel | — | February 2027 | sea trials | Builder's sea trials from 12 November 2026. BBC gives 335ft (102m). Handover timetable February 2027. | BBC News (opens in a new tab) |
| 20 x Candela P-12 (opens in a new tab) | Boreal | Candela | Sweden | fast passenger (electric hydrofoil) | — | — | — | battery-electric | 2026-04 | first units 2027; through 2030 | ordered | group row: 20 vessels | Ferry Shipping News (opens in a new tab) |
| SUMMIT ARBUTUS (opens in a new tab) | BC Ferries | China Merchants Industry Weihai | China | ro-pax (double-ended) | — | 2100 | — | hybrid-electric (ABB Azipod) | Q4 2025 | from 2029 | ordered | 360 vehicles; pax figure includes crew; yard/propulsion: https://ferryshippingnews.com/abb-to-power-four-hybrid-ferries-for-bc-ferries/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| SUMMIT CEDAR (opens in a new tab) | BC Ferries | China Merchants Industry Weihai | China | ro-pax (double-ended) | — | 2100 | — | hybrid-electric (ABB Azipod) | Q4 2025 | from 2029 | ordered | 360 vehicles; pax figure includes crew; yard/propulsion: https://ferryshippingnews.com/abb-to-power-four-hybrid-ferries-for-bc-ferries/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| SUMMIT MAPLE (opens in a new tab) | BC Ferries | China Merchants Industry Weihai | China | ro-pax (double-ended) | — | 2100 | — | hybrid-electric (ABB Azipod) | Q4 2025 | from 2029 | ordered | 360 vehicles; pax figure includes crew; yard/propulsion: https://ferryshippingnews.com/abb-to-power-four-hybrid-ferries-for-bc-ferries/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| SUMMIT SPRUCE (opens in a new tab) | BC Ferries | China Merchants Industry Weihai | China | ro-pax (double-ended) | — | 2100 | — | hybrid-electric (ABB Azipod) | Q4 2025 | from 2029 | ordered | 360 vehicles; pax figure includes crew; yard/propulsion: https://ferryshippingnews.com/abb-to-power-four-hybrid-ferries-for-bc-ferries/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TANCOOK ENDEAVOUR (opens in a new tab) | Nova Scotia (Province) | A.F. Theriault & Son | Canada | car ferry | — | — | — | — | — | late 2026 or early 2027 | sea trials pending | 18 cars; CAD 14.2 million province investment; Big Tancook Island–Blandford; replaces William G. Ernst. | Province of Nova Scotia (opens in a new tab) |
| TBN (Incat 129m #1) (opens in a new tab) | Molslinjen | Incat Tasmania | Australia | fast ferry (ro-pax catamaran) | 129 | 1483 | — | battery-electric (45 MWh) | 2025-07 | late 2027 | ordered | 500 cars; Kattegat | Ferry Shipping News (opens in a new tab) |
| SCILLONIAN IV (opens in a new tab) | Isles of Scilly Steamship Group | Piriou | Vietnam | ro-pax | 75 | 600 | — | not stated | 2024-06 | March 2027 | delivery voyage | Technically accepted 7 October 2026. Departed Vietnam 31 October 2026 on two-month delivery voyage; entry into service March 2027. | Isles of Scilly Steamship Group (opens in a new tab) |
| GOTLAND HORIZON X (opens in a new tab) | Gotlandsbolaget | Austal Philippines | Philippines | fast ferry (ro-pax catamaran) | 130 | 1500 | — | hydrogen-ready; gas/steam combined cycle; 780 kWh battery hybrid | 2025-02 | mid-2028 | ordered | 400 cars; battery: https://ferryshippingnews.com/echandia-to-supply-battery-system-for-gotland-horizon-x/ (opens in a new tab) | Ferry Shipping News (opens in a new tab) |
| TBN (292-pax hybrid) (opens in a new tab) | Fjord Shuttle (charter to Fjord Guiding) | Brødrene Aa Hyen | Norway | passenger vessel | — | 292 | — | hybrid (battery + diesel) | 2026-06 | Q2 2027 | ordered | NOK 135m | Ferry Shipping News (opens in a new tab) |
| B622 (Dønna–Herøy hybrid) (opens in a new tab) | Torghatten Midt | Remontowa Shipbuilding | Poland | ro-pax (double-ended) | 83.5 | 249 | — | diesel-electric hybrid (battery peak-shaving; expandable to full electric) | 2026-01-16 | Q2 2028 | keel laid | Keel laid 15 October 2026 (yard); FerryWire reports 16 October. 85 cars and 6 trucks. Dønna–Herøy. | FerryWire (opens in a new tab) |
| TBN (Callboats CAT 16) (opens in a new tab) | FRS Finland | Callboats | Finland | passenger ferry | 16 | 58 | — | battery-electric | 2026 | Sep 2027 (service) | ordered | length inferred from model name CAT 16 — treat as approximate | Ferry Shipping News (opens in a new tab) |
| TBN (Breistein–Valestrand) (opens in a new tab) | GulenSkyss | Fjellstrand | Norway | ro-pax | — | — | — | battery-electric | 2025-06 | service 29 Nov 2027 | ordered | 50 cars | Ferry Shipping News (opens in a new tab) |
| RUWI (opens in a new tab) | SeaLink | Batam shipyard (Sea Transport SA) | Indonesia | ro-pax | 60 | — | — | not stated | — | service expected December 2026 | delivered | Arrived Port Adelaide 19 November 2026 after delivery voyage from Batam. Expected to enter service in time for the December school holidays, subject to final safety and operational checks. | SeaLink Kangaroo Island (opens in a new tab) |
| SUPERFAST VI (opens in a new tab) | Superfast Ferries / Attica Group (bareboat from Stena RoRo) | China Merchants Industry Weihai | China | ro-pax | 239.7 | 1500 | 3320 | methanol-ready multi-fuel; battery-ready | — | spring 2027 | launched | launched 20 Aug 2026; Patras–Igoumenitsa–Ancona | Ferry Shipping News (opens in a new tab) |
| FERRY SHIGESA (opens in a new tab) | Oki Kisen (Oki Wide Area Union) | Naikai Zosen (Setoda) | Japan | ro-pax | 98.00 | 830 | — | diesel (two Daihatsu Diesel 6DKM-36e, 3,480 kW) | — | spring 2027 | launched | Launched 26 November 2026; 2,800 GT; 20 trucks and 26 cars; 19.0 knots service speed. | Shippax (opens in a new tab) |
| TBN (WO 288, 2nd Superfast E-Flexer) (opens in a new tab) | Superfast Ferries / Attica Group | China Merchants Industry Weihai | China | ro-pax | — | — | — | methanol-ready; battery-ready | — | summer 2027 | keel laid | keel plates laid Jan 2026 | Ferry Shipping News (opens in a new tab) |
| ESPAÑA 2030 (opens in a new tab) | Baleària | Armón Gijón | Spain | fast ferry (catamaran) | 87 | — | — | battery-electric (11.5 MWh) | — | summer 2027 (service) | floated out | Floated out in Gijón on 24 October 2026. Shippax says 11.5 MWh. The 2 October El Estrecho Digital notice scheduled the float-out for 23 October and did not state a battery capacity. | Shippax (opens in a new tab) |
| TBN (Green Ship 2.0 #2) (opens in a new tab) | TT-Line (Germany) | China Merchants Jinling Shipyard (Nanjing) | China | ro-pax | 240 | 930 | 5400 | LNG-hybrid + 5.5–10 MWh battery; shore charging | 2026-07 | — | ordered | Length 240 m is from MacGregor, 4 September 2026; the cited order article does not state length | Ferry Shipping News (opens in a new tab) |
| TBN (Incat 129m #2) (opens in a new tab) | Molslinjen | Incat Tasmania | Australia | fast ferry (ro-pax catamaran) | 129 | 1483 | — | battery-electric (45 MWh) | 2025-07 | — | ordered | 500 cars | Ferry Shipping News (opens in a new tab) |
| TBN (Incat 129m #3) (opens in a new tab) | Molslinjen | Incat Tasmania | Australia | fast ferry (ro-pax catamaran) | 129 | — | — | battery-electric | 2025-12 | — | ordered | — | Ferry Shipping News (opens in a new tab) |
| LOCH ETIVE (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | keel laid | ready for launch (Oct 2026) | Baird Maritime (opens in a new tab) |
| TBN (SVRP #3) (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | steel cut | construction begun on 5 of 7 | Baird Maritime (opens in a new tab) |
| TBN (SVRP #4) (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | keel laid | keels laid 8 Oct 2026 | Baird Maritime (opens in a new tab) |
| TBN (SVRP #5) (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | keel laid | keels laid 8 Oct 2026 | Baird Maritime (opens in a new tab) |
| TBN (SVRP #6) (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | ordered | — | Baird Maritime (opens in a new tab) |
| TBN (SVRP #7) (opens in a new tab) | CalMac (owner CMAL) | Remontowa Shipbuilding | Poland | ro-pax (small, SVRP) | — | — | — | battery-electric | 2025 | — | ordered | — | Baird Maritime (opens in a new tab) |
| LOCH INDAAL (opens in a new tab) | CalMac (owner CMAL) | Cemre Marin Endustri | Türkiye | ro-pax | — | — | — | — | — | — | delivered | Delivered 18 November 2026; second of four at Cemre. Islay service with MV Isle of Islay. | Caledonian Maritime Assets Ltd (opens in a new tab) |
| LOCHMOR (opens in a new tab) | CalMac (owner CMAL) | Cemre Marin Endustri | Türkiye | ro-pax | — | 450 | — | — | — | — | launched | launched 23 Aug 2025; 100 cars; Little Minch | Ferry Shipping News (opens in a new tab) |
| CLAYMORE (opens in a new tab) | CalMac (owner CMAL) | Cemre Marin Endustri | Türkiye | ro-pax | — | — | — | — | — | — | launched | launched 2 May 2026 | Ferry Shipping News (opens in a new tab) |
| MISTERØY (opens in a new tab) | Torghatten Nord | Özata Shipyard | Türkiye | ro-pax (double-ended) | 76.85 | 202 | — | battery-electric (1,960 kWh) | 2024 | — | delivered | 202 people incl. crew; 60 vehicles. Delivered 19 October 2026. FerryWire, citing Torghatten Nord: https://www.ferrywire.com/misteroy-delivered-to-torghatten-nord/. (opens in a new tab) Specifications remain from the 4 September 2026 sea-trials article. | Ferry Shipping News (opens in a new tab) |
| FLØYTIND (opens in a new tab) | Torghatten Nord | Özata Shipyard | Türkiye | ro-pax (double-ended) | 76.85 | 202 | — | battery-electric (1,960 kWh) | 2024 | — | ordered | — | Ferry Shipping News (opens in a new tab) |
| TBN (3rd NSD60CFe) (opens in a new tab) | Torghatten Nord | Özata Shipyard | Türkiye | ro-pax (double-ended) | 76.85 | — | — | battery-electric | option exercised | — | ordered | — | Ferry Shipping News (opens in a new tab) |
| SALTVÆR (opens in a new tab) | Torghatten | Western Baltija Shipbuilding | Lithuania | ro-pax | 73 | 199 | — | battery-electric | — | — | launched | 50 vehicles; Svolvær–Skrova | Ferry Shipping News (opens in a new tab) |
| TBN (52m HSC) (opens in a new tab) | Navigazione Libera del Golfo | Nova Shipyard | Türkiye | fast ferry (HSC) | 52 | 655 | — | not stated | 2026-08 | — | ordered | — | Ferry Shipping News (opens in a new tab) |
| 4 x TBN (lagoon ferries) (opens in a new tab) | ACTV (Venice) | CNV (Adria) | Italy | passenger ferry | — | — | — | not stated | 2026-02 | — | ordered | group row: 4 vessels, ~EUR 15m | Ferry Shipping News (opens in a new tab) |
| 13 x TBN (lagoon ferries) (opens in a new tab) | ACTV (Venice) | Cantiere Navale Giacalone | Italy | passenger ferry | — | — | — | hybrid | 2026-02 | — | ordered | group row: 13 vessels, ~EUR 34m | Ferry Shipping News (opens in a new tab) |
| SOUND OF SCALPAY (opens in a new tab) | Western Ferries | Balaena Birkenhead | UK | ro-pax (double-ended) | 50 | 220 | — | not stated | 2025-05 | — | under construction | named 23 Sep 2026; 40 cars | Greenock Telegraph (opens in a new tab) |
| SOUND OF SLEAT (opens in a new tab) | Western Ferries | Balaena Birkenhead | UK | ro-pax (double-ended) | 50 | 220 | — | not stated | 2025-05 | — | under construction | named 23 Sep 2026; 40 cars | Greenock Telegraph (opens in a new tab) |
| BURSZTYN UNITY (opens in a new tab) | Unity Line (PolSca Baltic Ferries) | Gdańsk Shiprepair Yard Remontowa | Poland | ro-pax | 195.6 | 400 | 4100 | hybrid (four LNG engines and a battery) | — | — | in service | Handed over 23 October 2026 (Promy24). First passenger sailing Ystad–Świnoujście 18 November 2026 (QNC News, 19 November 2026). | QNC News (opens in a new tab) |
| SPIRIT OF TASMANIA IV (opens in a new tab) | TT-Line (Spirit of Tasmania) | Rauma Marine Constructions | Finland | ro-pax | 212 | 1800 | 3700 | LNG-powered | — | — | in service | Delivered 12 September 2024. RMC media release dated 12.9.2024 says the Rauma shipyard celebrated the delivery of Spirit of Tasmania IV today. Geelong–Devonport. Entered passenger service 31 October 2026. ABC News says the new Spirit of Tasmania vessels have made their inaugural passenger sailings across Bass Strait: https://www.abc.net.au/news/2026-10-31/new-spirit-of-tasmania-inaugural-passenger-sailings/107326936. (opens in a new tab) Pulse Tasmania says the ships entered service and that the new ferries carried their first paying passengers from Geelong to Devonport: https://pulsetasmania.com.au/news/party-in-the-bass-strait-first-passengers-on-new-spirit-ship-soak-in-atmosphere/. (opens in a new tab) Pulse says Spirit of Tasmania IV is departing Geelong: https://pulsetasmania.com.au/news/new-spirit-of-tasmania-iv-and-v-ships-begin-passenger-sailings-tonight/. (opens in a new tab) | Rauma Marine Constructions (opens in a new tab) |
| SPIRIT OF TASMANIA V (opens in a new tab) | TT-Line (Spirit of Tasmania) | Rauma Marine Constructions | Finland | ro-pax | 212 | 1800 | 3700 | LNG-powered | — | — | in service | Delivered 25 June 2025. RMC media release dated 25.6.2025 says RMC has today delivered Spirit of Tasmania V. Geelong–Devonport. Entered passenger service 31 October 2026. ABC News says the new Spirit of Tasmania vessels have made their inaugural passenger sailings across Bass Strait: https://www.abc.net.au/news/2026-10-31/new-spirit-of-tasmania-inaugural-passenger-sailings/107326936. (opens in a new tab) Pulse Tasmania says the ships entered service and that the new ferries carried their first paying passengers from Geelong to Devonport: https://pulsetasmania.com.au/news/party-in-the-bass-strait-first-passengers-on-new-spirit-ship-soak-in-atmosphere/. (opens in a new tab) Pulse says Spirit of Tasmania V is leaving Devonport: https://pulsetasmania.com.au/news/new-spirit-of-tasmania-iv-and-v-ships-begin-passenger-sailings-tonight/. (opens in a new tab) | Rauma Marine Constructions (opens in a new tab) |
| SKAGASTØL (opens in a new tab) | Fjord1 | Tersan Shipyard | Türkiye | ro-pax | — | 399 | — | battery-hybrid | — | — | delivered | Delivered 13 November 2026; first of four for Lavik–Oppedal. 120 passenger-car equivalents. Voyage from Turkey approximately 3,700 nautical miles. | Baird Maritime (opens in a new tab) |
| ISLAND GWA'YAM (opens in a new tab) | BC Ferries | Damen Shipyards Galați | Romania | ro-pax (double-ended, Island Class) | — | — | — | hybrid-electric (designed for full electric) | — | — | in service | Entered service 17 November 2026 on Campbell River–Quathiaski Cove. | BC Ferries (opens in a new tab) |
| HELGØY (opens in a new tab) | Torghatten Nord | Hvide Sande Shipyard | Denmark | ro-pax | 49.9 | 149 | — | battery-electric (two 2 MWh packs; Scania DI16 gensets) | 2024-06 | — | delivered | Delivered 28 November 2026; route 182 Kvaløya; up to 30 cars. | Shippax (opens in a new tab) |
| WANGGAMI (opens in a new tab) | SeaLink | Batam shipyard (Sea Transport SA) | Indonesia | ro-pax | 60 | — | — | not stated | — | — | in service | Entered service 27 October 2026 (SeaLink timetable in 24 October release). Length 60 m and width 20 m from Grey Nomads, 27 October 2026. | SeaLink Kangaroo Island (opens in a new tab) |
| CAPT. ALMER DINSMORE (opens in a new tab) | Maine State Ferry Service | Senesco Marine | USA | ro-pax | — | 250 | — | hybrid diesel-electric | 2022 | — | in service | Commissioned 5 November 2026; WorkBoat gives 154 ft by 38 ft; 23 vehicles. | WorkBoat (opens in a new tab) |
| 3 x Styrsöbolaget electric catamaran (opens in a new tab) | Styrsöbolaget | GONDAN | Spain | passenger ferry (catamaran) | 35 | 197 | — | battery-electric | 2026-11-19 | — | ordered | Group row: 3 vessels; lead hull C520. | GONDAN Shipbuilders (opens in a new tab) |
| MOSKENES (opens in a new tab) | Torghatten Nord | Myklebust Verft | Norway | ro-pax | — | — | — | hydrogen (85% hydrogen capable; biodiesel backup) | — | — | under construction | Originally due 1 October 2025; service now planned summer 2027. 120-car Ro-Pax per source. | Baird Maritime (opens in a new tab) |
| RØST (opens in a new tab) | Torghatten Nord | Myklebust Verft | Norway | ro-pax | — | — | — | hydrogen (85% hydrogen capable; biodiesel backup) | — | — | under construction | Sister to Moskenes; delivery expected November 2027. | Baird Maritime (opens in a new tab) |